IPR Project
Improved Petroleum Recovery (IPR) Project
Onshore Oil Field in Henan Province, China
Project Objective
- To increase the oil production rate
Project Scope
- Well Fracturing
- Water Injection
- Well Perforation
- Well Repair and Well Cleaning
- Well Wax Cleaning & Removal
- Oil Field Equipment & Facility Maintenance
- Workover and Maintenance of Injection and Production wells
- Drilling new & deeper wells at optimum well locations based on subsurface study
Project Result
- Successfully increased oil production from 25bbl/day to 500bbls/day